Office/Retail
Back to work

WEWORK AT TOWN SQUARE

+
Client
WeWork
+
Project Duration
March 2019 – March 2020
+
Project Size
104,000 SF
+
Components
  • 1st generation buildout of 2nd and 3rd floors at Town Square
  • Completed project with occupied stores with a mix of on and off shift work to minimize disruptions to the tenants on the 1st floor
  • Completed layout of walls and light fixtures with Trimble positioning equipment

Overview

Harris Associates provided General Contracting Services for the first generation tenant improvement buildout of (2) floors at Town Square. Construction was completed with high-end luxury stores operating beneath. The company managed the project for the tenant (WeWork) and with the landlord (Fairbourne).

Harris Associates worked on the common area which included a kitchen complete with self-contained beer taps, as well as a library, elevated seating area and game area.

The MEP rough-in ran prior to the framing rough-in with the Trimble positioning system. 80% of the interior walls were commercial storefront systems, allowing electrical power to be ran though storefront mullions.

Testimonials

More projects

Back to all posts